![]() For example when the CTX1250 was installed they got the service technician to do the training with us and although is knowledge was reasonable it was far from what a programming educator would offer as I found out later. In saying that DMG I think are a bit of a cagey mob as they seem to try and get out of the genuine training time spent on sometimes what should be considered commissioning of the machine. We got training packages with most of the DMG machines that were bought where I work as most of them were purchased brand new or ex-show room models. Need Help!- Setting spindle parameters twin spindle Hamai.Need Help!- Post Needed For Twin Turret Twin Spindle - Mori NZX Preferred.Parameters for Matsurra RAIII DC twin spindle twin pallet VMC with Fanuc control.New Product- Twin Spindle CNC Turning Lathe JASU LS-40(S).Is there a way around this problem? Perhaps another method to Sync the chucks. I know you can run a grip cycle in shopturn but the problem with that cycle is when you stop and restart the program the machine wants to let go with the sub-spindle move back then come back in and re-grip. ![]() It needs to be gripped at all times with both chucks & is going to be on the machine about a week. It is a large job that needs to be setup Manually before running a program commences. ![]() I have a job coming up though that has stumped me. I currently running a CTX BETA 1250TC Mill Turn & have a good understanding of the shopturn software and also a good general knowledge of ISO programing on a number of controllers. ![]()
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |